Vessel schedules, portcalls, freight rates, and throughput for Poti (GE PTI). During May, 4k TEU were exported and 11k TEU imported, in a total of 23 vessel calls.
Vessel schedules, portcalls, freight rates, and throughput for Poti (GE PTI). During May, 4k TEU were exported and 11k TEU imported, in a total of 23 vessel calls.
Terminals
Name |
Operator |
Operator Owner |
Turnaround |
Throughput |
Portcalls |
Dwell imports |
Dwell exports |
APM TERMINALS POTI |
APM TERMINALS POTI SEA PORT |
Maersk (100.0%) |
3.8 |
13.8 |
20.0 |
0.3 |
|
POTI NEW SEA PORT CONTAINER TERMINAL |
POTI NEW SEA PORT CONTAINER TERMINAL |
|
2.7 |
2.1 |
3.0 |
|
|
Total - Poti |
|
|
3.6 |
15.9 |
23.0 |
0.3 |
|
Schedules
MMSI |
Name |
Arrival |
Departure |
Voyage |
271000647 |
DANIEL A |
Jun 5, 6 AM |
Jun 11, 11 AM |
|
210067000 |
CORELLI |
Jun 9, 12 AM |
Jun 10, 12 AM |
|
304140000 |
BF TROUT |
Jun 9, 8 AM |
Jun 12, 8 AM |
523E/524W |
255806099 |
MSC AGNA II |
Jun 9, 8 AM |
Jun 10, 6 PM |
DH520R |
271002587 |
AYSE NAZ BAYRAKTAR |
Jun 9, 5 PM |
Jun 10, 6 PM |
DI522R |
271001058 |
TOMRIZ A |
Jun 10, 9 PM |
Jul 1, 7 PM |
0022 |
255805922 |
MSC ELBE III |
Jun 11, 2 AM |
Jun 13, 10 AM |
XA524A |
271001092 |
CLAIRE A |
Jun 11, 1 PM |
Jun 26, 11 AM |
0023 |
352898711 |
MSC LEVANTE F |
Jun 11, 5 PM |
Jun 12, 5 PM |
XA518A |
247439600 |
EVER COZY |
Jun 12, 1 AM |
Jun 21, 12 AM |
|
352003652 |
PROS HOPE |
Jun 14, 8 AM |
Jun 15, 7 AM |
522E/522W |
271048694 |
MED AYDIN |
Jun 16, 10 PM |
Jun 18, 7 PM |
DC523R |